Industrial Plants — Steel Structure Fabrication and Turnkey Construction from One Partner

Fabrication, erection, and cladding of industrial production halls and steel structures. Steel structures to 800 tonnes. Free spans to 43.75 m. EN 1090-2 EXC4 certified. General contracting from design through turnkey handover. Since 1994.

Industrial Steel Structures Handover

One Partner from Raw Steel to Turnkey Handover — Fabrication, Erection, and Construction

Steiger acts as both the fabricator and the general contractor for industrial plant construction projects. We manufacture the steel structures in our own production facility, then erect and clad them on site — with full accountability from initial design through final handover.

This integrated approach eliminates the coordination risk and quality disputes that arise when fabrication and construction are split between separate contractors. Our clients receive a single point of contact, a single contract, and a single responsible partner for the entire project.

Certified to the Standards Industrial Construction Demands

Every steel structure we fabricate for industrial plant construction is manufactured under our certified quality management system. Traceability is maintained throughout the entire manufacturing process, from raw material to erected structure.

Certifications:

  • EN 1090-2 EXC4 — Execution Class 4: for structural steel fabrication and assembly
  • ISO 3834-2 — Comprehensive Quality Requirements for Fusion Welding of Metallic Materials
  • ISO 9001:2015 — Quality Management Systems
  • ISO 14001:2015 — Environmental Management Systems
  • ISO 45001:2023 — Occupational Health & Safety Management Systems

Personnel & Qualifications:

  • 10 TÜV Rheinland-certified welders (ISO 9606-1)
  • 2 International/European Welding Engineers (IWE/EWE)
  • 2 International Welding Practitioners (IWP)
  • 1 International Welding Technologist (IWT)
  • 20+ documented Welding Procedure Qualification Records (WPQRs)
  • Full material traceability to mill test certificates (MTCs)
Steiger - Industrial Steel Structures

Industrial Plant Construction — Full Scope Under One Roof

Steel Structure Fabrication

Steel Structure Fabrication

  • Production halls and industrial buildings up to 800 tonnes of steel structure
  • Steel trusses, tapered columns, beams, and hollow structural sections
  • Traceability maintained throughout the entire manufacturing process
On-site erection and cladding

On-Site Erection and Cladding

  • Fabrication, erection, and exterior cladding of production halls
  • Free spans up to 43.75 m in width
  • Steel structures up to 42 m in height
  • Multi-storey steel structures with simultaneous installation of process equipment
General Contracting

General Contracting

  • Complete project management from design through turnkey handover
  • Administration buildings, technical annexes, and ancillary structures
  • Access roads, platforms, and parking areas included in scope
  • Tailor-made technical solutions aligned with client requirements

Manufacturing Capacity for Large-Scale Industrial Steel Structures

Steel Structure Fabrication

  • Production area: over 7,000 m² with 9 bridge cranes (35-tonne lifting capacity)
  • Fabrication of welded steel structures from beams, hollow structural sections, and plates
  • Tapered columns, trusses, and custom structural elements

Material Cutting

  • CNC oxy-fuel plate cutting: 12,000 x 4,000 mm, thickness up to 120 mm
  • CNC plasma plate cutting: 12,000 x 4,000 mm, thickness up to 40 mm
  • NC Press Brake: up to 5,000 mm length, 400-tonne pressure

Welding Processes

  • Gas Metal Arc Welding (GMAW/MIG-MAG)
  • Gas Tungsten Arc Welding (GTAW/TIG)
  • Submerged Arc Welding (SAW)
  • Shielded Metal Arc Welding (SMAW/MMA)

Surface Treatment

  • Shot grit blasting (ISO 8501-1): cabin 14 m x 5.5 m x 5 m
  • Industrial airless spray painting: heated paint shop, 540 m²

Structural Capacity:

  • Steel structures up to 800 tonnes fabricated and erected
  • Free spans up to 43.75 m
  • Building heights up to 42 m
  • Full turnkey scope including administration areas, technical annexes, access infrastructure

Traceable Quality from Raw Material to Erected Structure

Material Traceability

  • Mill certificates to EN 10204 3.1 or 3.2
  • Material verification and documentation at each production stage
  • Certified material suppliers

In-Process Quality Control

  • In-process visual examination (VT) — Level II, in-house
  • In-process liquid penetrant testing (PT) — Level II, in-house
  • Ultrasonic testing (UT) — external partners
  • Radiographic testing (X-ray) — external partners

Dimensional Verification

  • Leica Absolute Tracker AT403: Laser tracker for large-scale dimensional verification
  • Hexagon Romer Portable Measuring Arm: 2.5 m working diameter for component verification

What this means:

Traceability is maintained throughout the entire manufacturing process — from certified raw material through fabrication, surface treatment, and on-site erection. Every weld is linked to a certified welder and a qualified welding procedure.

Completed Industrial Plant Projects

Continental Contitech — Carei, Romania (2012)

Role: General Contractor

Scope: Construction of Production Hall IV, administration area, access roads, and installation

Scale: approximately 800 tonnes total metal structure

Construction surface: approximately 14,579 m²

Polipol — Foieni, Romania (2016–2017)

Role: General Contractor

Scope: Expansion of production hall, administration building, and technical annexes

Scale: approximately 500 tonnes total metal structure

Steel trusses of 42.5 m in length, production hall with 43 m free span

GOTEC ROM S.R.L. — Satu Mare, Romania (2018)

Role: General Contractor

Scope: Construction of production hall and administrative area

Scale: approximately 6,000 m² production hall and 1,000 m² offices

Notable Achievements:

Fabrication, erection, and exterior cladding of a steel structure building in Northwest Romania

Fabrication, erection, and exterior cladding of a production hall with trusses — clear span 43.75 m

Fabrication, erection, and exterior cladding of a multi-storey steel structure with simultaneous installation of process equipment

Notable Clients:
Continental Contitech, Polipol, GOTEC ROM S.R.L.

See all our case studies

How We Execute Industrial
Plant Construction Projects

Step 1: Technical Review and Quotation

Submit your project brief, drawings, or specifications
Our engineers review for constructability and identify technical requirements
Detailed quote within 3–5 business days

Step 2: Design and Planning

Technical solution development aligned with client requirements
Structural design and approval coordination
Material specification and procurement planning
Quality control plan development

Step 3: Material Procurement

Certified material suppliers
Mill certificates and full traceability
Material verification and documentation

Step 4: Steel Structure Fabrication

Cutting, forming, and preparation of structural elements
Assembly and welding by certified welders under qualified welding procedures (WPS)
In-process dimensional verification and NDT

Step 5: Surface Treatment

Shot grit blasting to specified standard (ISO 8501-1)
Industrial airless spray painting (heated paint shop, 540 m²)
Coating thickness and adhesion testing

Step 6: Transport and Site Preparation

Secure transport of prefabricated structural elements
Site preparation and foundation coordination

Step 7: On-Site Erection

Assembly and erection of steel structure on site
Exterior cladding installation
Coordination of subcontractors (if required)

Step 8: Simultaneous Process Equipment Installation (If Required)

Fabrication and installation of process equipment concurrent with building construction
Coordination of equipment installation within the steel structure

Step 9: Finishing and Ancillary Works

Administration buildings and technical annexes
Access roads, platforms, and parking areas
All ancillary construction to scope

Step 10: Inspection, Documentation, and Handover

Final inspection and dimensional verification
Full documentation package
Turnkey handover to client

Request a Technical Quote

What Makes Our Industrial Plant Construction Different

Fabricator and Constructor in One

Most construction projects separate the steel fabricator from the general contractor, creating coordination disputes when structures do not fit, tolerances are missed, or delivery schedules slip. Steiger eliminates this risk entirely — we fabricate the structure and erect it ourselves, with single-point accountability throughout.

EN 1090-2 EXC4 Execution Class

Our steel fabrication is certified to EN 1090-2 Execution Class 4, for structural steel components. This certification applies to our full fabrication scope — from cutting and welding through surface treatment and dimensional verification.

Proven at Scale

We have completed industrial plant projects involving steel structures of 800 tonnes, free spans of 43.75 m, and building heights of 42 m. These are not theoretical capabilities — they are completed, documented reference projects.

Tailor-Made Solutions

We do not offer standard building catalogues. Every project is engineered to the client’s specific operational requirements, site conditions, and budget. Our engineers provide technical advice throughout the design phase to optimise cost and construction time.

Family-Owned Reliability Since 1994

Every project that leaves our production floor and construction site carries our name. We are not a high-volume contractor — we are a manufacturing and construction partner that treats each project as if it were our own. Direct access to decision-makers, flexible problem-solving, and long-term partnership focus.

“Professional, Experienced, Trustworthy”
MALCHEM ROMANIA

+
Years in business
+
Employees
+
m² production facility
Industrial Steel Plants FAQs

Frequently Asked Questions

Both. Steiger operates as a general contractor for industrial plant construction — managing the full scope from design through turnkey handover — and as the fabricator of all steel structures. In both cases, fabrication takes place in our own production facility.

Our largest completed reference project is Production Hall IV for Continental Contitech in Carei, Romania — approximately 800 tonnes of total metal structure and 14,579 m² of construction surface, completed in 2012.

We have delivered production halls with clear spans of 43.75 m, and steel trusses of 42.5 m in length. We have also completed the tallest (42 m) steel structure building in Northwest Romania.

Yes. Our general contracting scope includes the main production hall, administration buildings, technical annexes, access roads, platforms, and parking areas — all delivered under a single contract.

Yes. We have experience in fabricating, erecting, and externally cladding multi-storey steel structures with simultaneous installation of process equipment inside the building.

Our steel fabrication is certified to EN 1090-2 EXC4 (Execution Class 4), ISO 3834-2 (Comprehensive Quality Requirements for Fusion Welding), and ISO 9001:2015. All welding is performed by TÜV certified welders under qualified welding procedures (WPQRs).

Yes. Traceability is maintained throughout the entire production process, from raw material to final delivery. All materials carry mill test certificates to EN 10204 3.1 or 3.2 as required.

Lead times depend on project scope, design complexity, permitting, and site conditions. Please contact us with your project brief and timeline for a realistic assessment.

Ready to Discuss Your Industrial Plant Project?

Tell us your component type, specifications, and timeline. Our engineers will review your requirements and respond with a detailed technical quote.

CTA1 – EN
Scroll to Top